
Turnkey + Concrete
Carports with Concrete — One Contract, Start to Finish
Plan the pad and the carport together. Triple J Metal can handle site prep, concrete and a welded steel structure on one contract. We itemize the scope so you see what’s in it, and you deal with one company.
Free quote
Get your price
What’s included
What’s included
Site Grading & Prep
Our John Deere skid-steer clears brush, grades and levels the pad area, and sets up drainage before the pour.
Concrete Pad Pouring
Poured on site at 3,000 PSI standard (4,000 PSI on request), reinforced, and sized to your structure.
Steel Structure Installation
Once the pad cures, our crew returns to erect and weld the carport, garage or barn, any size. The structure anchors to the pad.
One Invoice, One Warranty
No finger-pointing between your concrete crew and your steel crew. Triple J Metal owns the whole job, ground to roof.
All Structure Types
This package covers carports, garages, barns, RV covers and metal porches. If it sits on a pad, ask us.
Permit Advisory
We walk you through Bell County and nearby county requirements. Who files what is confirmed in your written scope.
Built for Central Texas
We review the site, use, dimensions and foundation before we finalize your turnkey project. Gauge, anchoring, engineering, finishes and warranty are confirmed for your design. Concrete is a separately priced part of the same contract. We can talk through permit requirements. Filing and approvals are confirmed before work starts.
Questions
What people
ask us.
Still unsure? Call 254-346-7764. A real person from our Temple crew picks up.
Yes. We grade the site, pour the pad and build the structure on one contract. Concrete is priced as its own line, so you can see what each part costs.
Standard residential carport and garage pads are 4" thick with reinforcement. We pour 6" reinforced slabs for heavier structures or RV weights. We recommend the right spec during your quote.
Grading and concrete usually take one day. After a 7-day cure, we return and usually install the structure the same day. Total project time is 8–10 days from job start, weather permitting.
Yes. We grade and level first. Steep slopes may need extra site prep, and we assess that on the quote walk.
Further reading
Guides from the crew.
Get a quote
Tell us about
your build.
Two quick steps — turnkey + concrete is already picked. A real Texas crew on the other end, not a form into a black hole.
- Free quote, no obligation
- Julian texts back within an hour
- Military, first-responder & trade discounts honored



